Renovate Dorms 406 & 407

Client Shaw Air Force Base
Architect LBE Engineers / Consultants
Location Shaw AFB, SC
The renovation of buildings 406 and 407 included upgrades to 80 and 68 dorm rooms, respectively, with each room featuring a private bathroom and kitchenettes shared between pairs of rooms. Both buildings underwent asbestos and mold surveys, followed by remediation. The project involved the demolition of the entire HVAC system, all shower inserts, the mail room (which was expanded into the lounge), all flooring, suspended acoustical ceilings, and select millwork.

New installations included a modern HVAC system with new ductwork and DDC controls, fire alarm and protection systems, tankless water heaters, and upgraded plumbing fixtures. The flooring was replaced with a mix of carpet, LVT, polished concrete, ceramic tile, and resilient flooring for stairwells. Energy-efficient LED lighting with occupancy sensors was installed throughout, along with LED exterior lighting. New suspended acoustical ceiling tiles and grids were added, and all walls, ceilings, doors, frames, and handrails received fresh paint. Additional improvements included dorm room vanities, kitchenette cabinetry, and countertops, as well as landscape enhancements and utility connections.